Why this decision comes before the architect
Most of what makes a custom home project easy or hard is settled before the first drawing: it is the lot. Two parcels with the same asking price can differ enormously in what they allow you to build and what it takes to build it. Buyers who check carefully before closing avoid the unpleasant surprise of learning, after the purchase, that the lot supports a smaller house than they imagined or needs far more site work.
This guide is written from a builder's seat. RJY Construction Inc. (License #1040732) builds custom homes from its Belmont office across San Mateo County and nearby towns. We are not attorneys, surveyors or real estate agents, and nothing here replaces their advice. We can tell you what we look for when someone asks us to walk a lot before they buy it.
Is a vacant lot or a teardown the better starting point?
Vacant lots are scarce on the Peninsula, so most buyers who want a custom house end up with a teardown: an older house on a lot that is worth more than the structure. A vacant parcel avoids demolition, but it may lack utilities, a driveway or a graded building pad, and it may be vacant because something about it is difficult. A teardown comes with utilities and access in place, and you can see what the neighbors look like, but you take on demolition and the possibility of hidden conditions under the old house.
Neither is automatically easier. What matters is what you learn about the specific parcel.
What does zoning allow?
Every city sets limits on how big a house can be, how tall, how close to the property line and how much of the lot it can cover. Those limits determine the house you can build, and they may be smaller than the house now standing. Ask the city planning counter, or have your architect do a feasibility study, before you commit. Ask also about design review: some towns, including Hillsborough, Atherton, Woodside and Portola Valley, review the design of new houses before issuing building permits, and others review certain projects such as two-story homes.
What is under and around the lot?
Soil and slope
A geotechnical investigation tells you what the ground is like: how firm it is, whether there is groundwater and whether a slope is stable. On hillsides in Belmont, San Carlos and Portola Valley, it shapes the foundation and the retaining walls. On reclaimed or low-lying ground such as Foster City and Redwood Shores, it addresses settlement and water. It is common for buyers to order the report, or at least to speak with an engineer, during the contingency period.
Access
Can a concrete truck reach the site? Is the street narrow, steep or gated? Is there room to stage materials? Access affects cost and neighbor relations, and a builder can tell you quickly whether a lot will be easy or awkward to work on.
Utilities
Check where water, sewer, gas and electric connections are and what condition they are in. A vacant lot may need new connections. A teardown may have old sewer laterals or undersized services that should be replaced as part of the new house.
Trees, creeks and flood areas
Mature trees add value but can be protected, which affects where a house can go and how the site must be fenced during construction. Parcels near creeks or in mapped flood areas may have rules about the height of the lowest floor or the foundation type. Ask the city what applies.
Easements, boundaries and associations
A survey and a title report reveal easements, boundary questions and shared access. In planned communities such as Redwood Shores and Foster City, an association may need to approve the exterior of your new house on top of the city's approval. Read the governing documents before you buy.
What will the old house cost to remove?
Demolition is not simply knocking a building down. Utilities must be disconnected, hazardous materials such as asbestos or lead paint may need to be tested for and handled, and debris is hauled away under rules about recycling. Older houses can hide surprises, and a builder can help you think through the demolition plan before you buy.
Why custom home prices are hard to quote
You will see figures online for the cost to build a custom home, and the question "what is the average cost to build a custom home" is a common one. National averages do not carry over to the Peninsula, where land, labor, engineering requirements and finishes differ. Within the Peninsula the range is wide. The biggest drivers are the size of the house, the difficulty of the site (slope, soil, access), the foundation and retaining systems it requires, the level of finish and the design itself. We give a written estimate only after we have seen your lot and your plans, and we prefer that you not rely on a rule of thumb for something this large.
What to do before you sign
- Ask the city what the zoning allows and whether design review applies.
- Have an architect run a quick feasibility study of the house you want on the lot.
- Order or discuss a geotechnical review if the lot is sloped, near water or on fill.
- Review the survey, title report and any association documents.
- Ask a builder to walk the lot and tell you about access, utilities, demolition and site work.
- Compare what you learn against your budget before the contingency period ends.
Walk the lot with us first
If you are considering a parcel, call (650) 315-0023 or use the contact form to book a free consultation. We will look at the lot with you, explain what we see and tell you which questions to put to the city, your architect and your engineer. If you buy it, we can build from your architect's plans, handle the permits for permitted work and manage the project from first walkthrough to final inspection.
Ready for a transformation?
Our design-build team specializes in high-end remodels in Belmont and surrounding cities. Get a professional estimate today.
Request an Estimate